Configuration and staging programme

Plug n' Go: hardware configured, imaged and burn-in tested before it ships

Most project delays are not caused by the hardware itself. They are caused by kit arriving as parts, on mismatched firmware, unlabelled, needing a day of configuration in a comms room or on a vessel with no bench and no spare time. Plug n' Go moves that work into our facility. What reaches site is installation, not assembly.

YOT LTD staging facility preparing configured hardware before dispatch

What Plug n' Go includes

Every deliverable is handled by named people on your account, before the shipment leaves us.

Assembly and build

Servers, switches, racks and appliances are built to the agreed bill of materials rather than shipped as a pallet of boxes to be assembled on site.

Firmware and BIOS levelling

Every unit in a rollout leaves on the same firmware build, which removes the mismatch that makes templates, VPN profiles and management tooling behave differently between sites.

Imaging to your gold standard

Operating systems and standard builds are applied before dispatch, so endpoints and servers arrive matching the estate they are joining.

Configuration applied in advance

Firewall rules, VLANs, QoS, VPN tunnels, SIM profiles and cloud management enrolment are applied and verified on the bench.

Labelling per location

Devices, patch cords and ports are labelled as a set per rack, cabin, desk or site, so installation is placement rather than tracing.

Burn-in testing

Kit is powered, loaded and tested before it leaves us. Failures surface in our facility, not in a dry dock.

Build sheet and documentation

Each shipment carries a documented build sheet and, where relevant, an as-built port map for handover.

Consolidated dispatch

Everything for a site is packed and shipped as one consignment from Malta, Germany or Poland, timed to the install window.

How it runs

  1. 01

    Design and bill of materials

    A pre-sales engineer sizes the design with your team and returns one quote covering hardware, licensing, staging and freight.

  2. 02

    Build and configure

    Hardware is assembled, firmware levelled, imaged and configured against the agreed standard in our own facility.

  3. 03

    Test and document

    Burn-in testing is completed, labelling applied and a build sheet produced for the shipment.

  4. 04

    Consolidate and ship

    Lines are consolidated per site and dispatched as one delivery, timed to your refit or handover date.

  5. 05

    Install and support

    Your crew mounts and connects. RMA handling, spares and escalation stay with us afterwards.

Where it matters most

Maritime and refit
Dry-dock windows do not move. Kit that arrives built, tested and labelled is the difference between commissioning on schedule and carrying a snag list into sea trials.
Enterprise
Multi-site rollouts where every location has to receive an identical, documented build.
Energy and remote sites
Locations where a second visit is expensive and a failed unit cannot wait on a courier.
Commercial
Fit-outs with a fixed handover date and no room on site for a staging bench.

Plug n' Go questions

Scope a project with us

Send a bill of materials or a design brief. A technical pre-sales specialist replies within one business day with hardware, licensing, staging and freight on one quote.

Not trading with us yet? Open a partner account.