Cabinet sized to the location
U height, depth, wall or floor mounting, door type and shelving are chosen against the space and the load rather than ordered to a default.
Rack design and pre-build
A rack is the one part of a project that cannot be fixed remotely. Get the U height, power draw, cable management or patch layout wrong and somebody is unbolting hardware in a plant room. We specify the cabinet with your engineers, build and terminate it here, load test it, and deliver it with documentation.

Every deliverable is handled by named people on your account, before the shipment leaves us.
U height, depth, wall or floor mounting, door type and shelving are chosen against the space and the load rather than ordered to a default.
Patch panels, keystones, brush and cable management, fibre enclosures and patch cords are picked as one package per rack from the Digitus and Lanberg catalogues.
Metered PDUs are specified against the actual load, including PoE budget for the switching, with headroom for startup demand.
The cabinet is populated, cabled, terminated and dressed before it ships, so on site the task is mounting and connecting.
Ports, panels and devices carry a consistent labelling scheme across every rack in the project, which keeps spares and documentation interchangeable.
Active hardware is powered, loaded and tested in the rack before dispatch.
Documentation is delivered with the hardware, which keeps handover straightforward for class, yard and building surveyors.
Copper and fibre components are ISO/IEC 11801 and EN 50173 aligned, so the passive layer survives inspection.
Space, mounting, power availability, device count and PoE draw are reviewed with your engineers.
Cabinet, passive package, PDUs and active hardware are drawn into a single bill of materials and quoted as one line item per rack.
The cabinet is populated, cabled, terminated, dressed and labelled in our facility.
Hardware is powered and tested in place, and the as-built port map is produced.
The rack is packed and delivered complete to the site it belongs to, timed to the install window.
Send a bill of materials or a design brief. A technical pre-sales specialist replies within one business day with hardware, licensing, staging and freight on one quote.
Not trading with us yet? Open a partner account.